High-Stakes Erosion Control on the Panama Canal (Erosion Control: Jan/Feb 2017)
On a project with exceptional challenges from its sheer scale, 136.5 inches of annual rainfall, and strict environmental guidelines, Profile saved the Panama Canal Authority as much as $ 1million, and kept 30-45 degree slopes virtually erosion free with sediment runoff estimated at just 1%.
Original article written by Adam Dibble for Erosion Control. View the online version.